General design, direction and safety coordination of works for reinforced concrete underground tank in the Foundry of Lucchini RS, part of the "Offshore" Project; excavation of 12 meters in depth, close to the existing columns (whose footings are reinforced with piles with 9 meters are below the water level: realization a crown of jetgrouting (270 columns 14 m deep) and bottom plug in jetgrouting; subsequent waterproofing sheet with bentonite, stalls in reinforced concrete with tie rods, circular walls of the well (amount of works about € 1.000.000)
Design and calculus of facilities, with safety coordination and work direction for complex foundations, with intake of smoke pipe, binary exchange in the Foundry of Lucchini RS, part of the ddd “Offshore” Project.
Project and direction of displacement of industrial suction duct, as part of the “Offshore” project in Foundry of Lucchini Rs
Complex foundations in concrete and steel for new rolling line (with press, manipulator, descaler, flame cutting, sawing and other machines) for Lucchini Rs (€ 400.000)
Block foundations for new armed group working in the wheels department of Rodeggi at Lucchini Rs (€ 350.000)
Underground tunnel, foundations for machines, structures for electric and pump cabin, with calculus, direction of work and safety coordination in Forging and Steel departments of Lucchini Rs
Anchor plates and slabs for vibrating machines and group screen-hopper for Beton Camuna Spa in Darfo B.T. (€ 350.000)
Structures for basements of cranes and other plants
Foundations and supports for new splice press in Rodeggi department of Lucchini Rs
Reinforced concrete walls for separations in the Scrap Yard of Lucchini Rs
Foundation and supports for test line in the Rodeggi department of Lucchini Rs
Foundations and underground structures for chimney and pipes of mill line of Lucchini Rs
Foundations and supports for various machines of the processing line in Termic Treatments of Lucchini Rs
Foundations for saw in the mill line of Lucchini Rs
Foundations of various machines in the wheel line of Lucchini Rs
Structural repair of two bridles on Dezzo river in Angolo Terme e Darfo B.T.
Structural reinforcement of damaged retaining walls in Erbanno, with resurfacing of sections of walls, insertion of rods and poles
Project and work direction of ew drainage system for with and black waters in Bessimo with underground crossing of Oglio River and pump station
Retaining walls, piling, special foundations, accommodation of banks and levees
At the Gallinelli office of engineering our goals are the professionality, the precision in calculations and the quickness in execution. More than 30 years of experience, the up-to-date techniques and our being constantly informed about the news in our field allows us to guarantee our client that every little technical aspect of a job will be followed from the beginning of the project to the final realization.