Studio d'ingegneria Gallinelli

  • Crafts Sheds

    Project and work direction of several sheds, including those held by Legno Camuna, Rebaioli Spa, Autoconcessionaria Sagrini, etc ...

  • Steel portal for column elimination in the Foundry of Lucchini Rs

    Design, work direction and safety coordination for elimination of a column in the Foundry of Lucchini RS, part of the "Offshore" Project: new portal in steel, with beams of 19 meters, holding the covers of 2 sheds and 2 contemporary bridge cranes of 60T each designed and constructed to be put in place without any shoring of the column to be demolished; calculus of reinforced footings with piles 25 m in depth; (works amount about € 250,000)

  • Quenching tank for the “Offshore” Project for Lucchini Rs

    General design, direction and safety coordination of works for reinforced concrete underground tank in the Foundry of Lucchini RS, part of the "Offshore" Project; excavation of 12 meters in depth, close to the existing columns (whose footings are reinforced with piles with 9 meters are below the water level: realization a crown of jetgrouting (270 columns 14 m deep) and bottom plug in jetgrouting; subsequent waterproofing sheet with bentonite, stalls in reinforced concrete with tie rods, circular walls of the well (amount of works about € 1.000.000)

  • Foundations for hardening furnace, cart and other systems

    Design and calculus of facilities, with safety coordination and work direction for complex foundations, with intake of smoke pipe, binary exchange in the Foundry of Lucchini RS, part of the ddd “Offshore” Project.

  • Displacement under the ground of suction duct

    Project and direction of displacement of industrial suction duct, as part of the “Offshore” project in Foundry of Lucchini Rs

  • Restructuring and consolidation of the electric cabin for the “Offshore” Project

    Design, work direction and safety coordination for renovation of an existing building, with reinforcement of floor slab and other structures, for Lucchini Rs

  • Seismic verification of the Foundry sheds

    Seismic calculus of existing steel structure of two sheds with cranes of Lucchini Rs

  • Seismic verification of the Mechanics sheds

    Seismic calculus of existing steel and concrete structure of two sheds (7.000 sq meters) of Lucchini Rs, with design of reinforcements

  • Seismic verification of the Scrap yard shed

    Seismic calculus of existing steel structure of the Scrap Yard shed of Lucchini Rs (8.300 sq meters) , with design of reinforcements

  • Seismic verification of a Water Tower

    Seismic calculus of existing structure of the Water Tower of Lucchini Rs

  • Complex foundations for new rolling line

    Complex foundations in concrete and steel for new rolling line (with press, manipulator, descaler, flame cutting, sawing and other machines) for Lucchini Rs (€ 400.000)

  • Complex foundations for new lathes in rolling line

    Block foundations for new armed group working in the wheels department of Rodeggi at Lucchini Rs (€ 350.000)

  • Foundations and structures for new vacuum system in Forging and Steel departments

    Underground tunnel, foundations for machines, structures for electric and pump cabin, with calculus, direction of work and safety coordination in Forging and Steel departments of Lucchini Rs

  • Structural reinforcement of beams for crane-lane

    Verification and reinforcement of 30+ beams serving as crane lane bridge in the Mechanics Department of Lucchini Rs

  • Anchor plates and slabs for vibrating machines and screen-hopper group

    Anchor plates and slabs for vibrating machines and group screen-hopper for Beton Camuna Spa in Darfo B.T. (€ 350.000)

  • Craft shed for Sias Society

    Design, work direction and safety coordination for structures and global project of new shed, including subsequent creation of new internal floor

  • Steel stable in Darfo

    Steel structure for new stable in Darfo B.T.

  • Basements of cranes

    Structures for basements of cranes and other plants

  • Steel shelter for Bergamo train station

    Steel structure with concrete foundations for new shelter in the Train Station of Bergamo

  • Steel frame for ceiling

    Steel frame for ceiling in Rebaioli’s shed

  • Underground tanks for the treatment of first rain water

    Project and construction management of four underground tanks for the treatment of first rain water at Lucchini Rs (€ 950.000)

  • Structures for fire prevention in Modellers building

    Works for fire subdivision in the Modellers building of Lucchini Rs

  • Steel structure for frame close

    Structure in support of panel for industrial shed for Lucchini Rs

  • Renovation of Modellers building

    Global renovation of Modellers building for Lucchini Rs

  • Renovation and new structures for MET Laboratories

    Design, direction and safety coordination for renovation and new structures of MET Laboratories for Lucchini Rs

  • Foundations for new splice press

    Foundations and supports for new splice press in Rodeggi department of Lucchini Rs

  • New steel floor for locker plants

    New steel floor for main locker plants to fit into masonry building, with consolidation of existing facilities for Lucchini Rs (€ 300.000)

  • Walls for separation of tanks in the Scrap Yard

    Reinforced concrete walls for separations in the Scrap Yard of Lucchini Rs

  • Foundation for test line

    Foundation and supports for test line in the Rodeggi department of Lucchini Rs

  • Foundations and structures for chimney and pipes of mill line

    Foundations and underground structures for chimney and pipes of mill line of Lucchini Rs

  • Foundations for processing line in Heat Treatments

    Foundations and supports for various machines of the processing line in Termic Treatments of Lucchini Rs

  • Foundations for steel saws

    Foundations for saw in the mill line of Lucchini Rs

  • Foundations of various machines

    Foundations of various machines in the wheel line of Lucchini Rs

  • Metal canopy

    Steel structure for metal canopy with span of 5.5 meters for parking mans for Lucchini Rs

  • Photovoltaic system on three industrial sheds

    Safety coordination for installation of 10.000 sq meters of photovoltaic panel of the roof of three industrial sheds, at height of 25 meter, with substitution of roof cover plates for Lucchini Rs (€ 3.000.000)

  • 1

Gallinelli office of engineering

At the Gallinelli office of engineering our goals are the professionality, the precision in calculations and the quickness in execution. More than 30 years of experience, the up-to-date techniques and our being constantly informed about the news in our field allows us to guarantee our client that every little technical aspect of a job will be followed from the beginning of the project to the final realization.

golden goose outlet online golden goose femme pas cher goedkope golden goose kopen fjallraven kanken backpack sale fjallraven kanken rugzak kopen fjällräven kånken reppu netistä fjallraven kanken táska Golden Goose Tenisice Hrvatska Basket Golden Goose Homme Golden Goose Sneakers Online Bestellen Kanken Backpack On Sale Fjallraven Kanken Mini Rugzak Fjällräven Kånken Mini Reppu Fjallraven Kanken Hátizsák
Cookies make it easier for us to provide you with our services. With the usage of our services you permit us to use cookies.
More information Ok Decline